Silicone rendering costs and quotation scope

Compare the wall preparation, named finish and access package before comparing the total price.

Call 01925 918785

Illustrative modern British house with a fine-textured pale silicone-render finish and contrasting brickwork.

The cost of silicone rendering depends on the wall being treated and the work needed around it. A new extension ready for its specified coats is a different package from a house with coatings to remove, shallow sills to alter and limited access. Ask for a written quotation that connects the price to those conditions. You can then see which parts are fixed, which depend on investigation and which belong to another trade.

A wall-area figure needs a description beside it

Start with marked photographs or drawings showing exactly what you want rendered. Include side returns, reveals, porch walls and any areas that will retain another material. Ask the estimator how the quotation measures openings and small details. The measurement basis should make sense alongside the actual work, rather than leaving you to compare two unexplained square-metre figures.

Separate a new finish on an accepted background from removal and repair work. If a contractor has allowed for sound existing render to remain, the proposal should identify that assumption. Another contractor may have priced removal. The totals describe different jobs until that difference is resolved, even when both name the same decorative product.

Find the items that change the price

Use a short list of project decisions to examine a quotation. Large uninterrupted surfaces, narrow strips around openings and awkward returns involve different operations. The number of visits and the sequence of other trades also matter. Ask what the contractor has actually included for these conditions, rather than trying to infer it from the total.

The table below is a scope checklist, not a price formula. An item may be minor on one property and a separate package on another. Have the contractor identify the decision that needs making and its effect on the proposed work. That is more useful than adding an arbitrary percentage to every quotation.

Questions that explain a rendering quotation
Scope itemQuestion to settlePossible effect on the package
Old finishRetain, remove or investigate which areas?Different preparation and disposal work
RepairsWhat is established and what remains concealed?Defined work or an authorised variation
Openings and edgesWhich sills, reveals and terminations change?Extra materials and other-trade coordination
AccessHow will each elevation be reached safely?Equipment, protection and work sequence
FinishWhich product, texture and sample are included?Specific material and approval requirements
OccupationWhich entrance and routes must remain usable?Phasing and temporary arrangements

Make allowances specific enough to use

A trial or inspection may be needed before the extent of preparation can be fixed. Describe the question it will answer: for example, what remains after a coating is removed from an agreed test area. Ask who arranges the investigation, what the price includes and how the result will be recorded. Keep that item separate from a vague contingency for anything unexpected.

Before intrusive work, establish what asbestos information or further survey is required for the affected fabric. HSE's survey guidance distinguishes the purpose and reach of different investigations. Any necessary specialist work needs a clear responsibility and scope. When a concealed condition changes the rendering proposal, agree the revised work and cost before it is covered.

Check the product package and the samples

The quotation should name the decorative finish and the preparation, supporting coats and primer required for that construction. K Rend's TC guidance describes a product sequence; simply writing silicone finish leaves important materials unspecified. If an alternative is offered, request its complete proposal and review it against the same background and appearance requirements.

Include the sample arrangement and approval point. A flat colour panel, a corner sample and a repair trial answer different questions and take different work. Record what has been allowed for, who approves it and what happens if a changed selection requires another sample. Keep the accepted product and colour reference with the quotation.

Illustrative render sample panels in pale grey, warm white and light stone beside brickwork.

Put surrounding alterations in the right package

A new render line may affect the work at windows, doors, downpipes and roof edges. List any required adjustment and name the trade responsible for it. Check whether removal, temporary arrangements, refitting and making good are included. This prevents an important detail appearing to be covered by several prices while none actually contains the whole task.

Include any approval or design work that remains outstanding. The relevant planning position and building-regulations requirements need to be established for the proposal. Changes to a wall can raise energy-performance questions under Part L; the responsible designer should identify the applicable provisions and edition before a rendering-only quotation is treated as a complete refurbishment solution.

Compare the programme and commercial conditions

Ask what must be complete before the contractor starts and which stages depend on weather or the specified materials. Check how occupied access will be maintained and who coordinates other work at the elevation. HSE's work-at-height guidance requires suitable planning and competence; the quotation should allow for access appropriate to the task.

Finally, read the exclusions and the commercial conditions together. Clarify tax treatment, quotation validity, payment stages, waste handling and the authorisation of changes. At handover, request the installed product information and any agreed inspection records. These are matters for the actual written proposal, and should be settled before it is accepted.

Questions and answers

Can a quotation use a square-metre rate?

Yes, provided it states how the area is measured and exactly which operations the rate covers. Compare access, preparation, details and exclusions as well as the rate. A project total still needs a defined scope.

Should I get a price before choosing the colour?

An initial proposal can record a provisional selection. Before accepting it, establish the actual finish, sample requirements and any resulting change to materials or work. Keep the agreed selection in the written package.